-
Recent Posts
Recent Comments
- Captain on Bottom Re-lamination
- Chris Hofman on Bottom Re-lamination
- Captain on Bottom Repair – The Big Peel!
- ed on Bottom Repair – The Big Peel!
- Captain on Bottom Repair – The Big Peel!
Archives
Categories
- Charging Systems (3)
- Diesel Maintenance (1)
- Dinghy Project (1)
- Electrical Systems (5)
- Equipment Installation (4)
- Fleet of Boats (5)
- General Maintenance (11)
- Golden Bear in San Francisco (1)
- Herrington Harbour North (5)
- Hull Maintenance (15)
- Maintenance Tips (6)
- Passage Making (2)
- Ports of Call (4)
- Random Bits of Living (20)
- Rigging Repair and Maintenance (12)
- Rudders (2)
- S/V Fin Log (7)
- Sail Maintenance (2)
- Second Star (40)
- Spirit (2)
- Travel Log (19)
Meta
Daily Archives: August 5, 2013
Solar Panels on Cantilever Adjustable Mounts
I have worked on the design and fabrication of the adjustable solar panel mounts for more than two months, on and off. The number of parts is staggering considering this seemed such a simple idea in my head. In the … Continue reading
Posted in Charging Systems, Electrical Systems, Second Star
Leave a comment