Monthly Archives: May 2014

Sugar Scoop Construction

A nice modification for a traditional transom is adding a small addition which provides a convenient swim step and dinghy boarding area. If the projection is kept to a minimum it should not interfere with carrying a dinghy on davits. … Continue reading

Posted in Hull Maintenance, Second Star | Leave a comment

Swim Step Removal

The old swim step has seen better days. I have been thinking about replacing the weathered swim step with an attractive cold molded “sugar scoop”. I believe doing this before the bottom re-lamination makes for a stronger scoop, as the … Continue reading

Posted in Hull Maintenance, Second Star | Leave a comment